Control programme & test plans
Control programme, tasks & test plans, templates, standards
The programme plan, the verification plan and the recurring test intervals live in one place. Due dates are visible before they expire, not afterwards.
The ESD software for your compliance – test plans, measurements, calibration and records in one place.
ESD Manager
Documentación digital, reportes automáticos y tablero en vivo para todas las sedes.
The software follows the structure of an ESD control programme rather than the structure of a database. Five areas, twenty-two modules:
Control programme, tasks & test plans, templates, standards
The programme plan, the verification plan and the recurring test intervals live in one place. Due dates are visible before they expire, not afterwards.
Measurements, walking tests, personnel testers, devices & calibration
Every reading is recorded against its limit, with the device it was taken with. Each device carries its calibration date, so an expired instrument cannot quietly invalidate a year of records.
Audits, walk-throughs, hazard & process analyses, quality management
Internal audits, EPA walk-throughs and the findings from both, with the actions that followed – the part auditors ask to see first.
ESD responsible person, area managers, contacts & qualifications, e-learning
Who is responsible for which area, who has been trained, when the refresher is due – and the online course linked to it.
Products, purchasing, work preparation, organisation
ESD materials with their properties, the sites and areas they belong to, and what has been ordered for them.
The starting point
Almost every ESD programme starts in Excel, and for a single line that even works. It stops working at the point where the programme has to prove itself – and the move to the 2025 edition sharpens that, because the scope of testing and the documentation duties both grow:
Standard reference
DIN EN IEC 61340-5-1 does not require software. It requires a programme, evidence and someone responsible. The table shows which module holds which of those:
| Requirement of the standard | Module |
|---|---|
| A written ESD control programme plan | Control programme |
| A compliance verification plan with defined test intervals | Tasks & test plans |
| Testing with suitable, calibrated measuring equipment | Devices & calibration |
| Documented measurements assessed against limits | Measurements · walking tests · personnel testers |
| Initial and refresher training with records | Contacts & qualifications · e-learning |
| Named responsibilities for the programme | ESD responsible person · area managers |
| Records kept and producible on request | Audits · walk-throughs · templates |
Details of the current edition and the transition period until June 2027: DIN EN IEC 61340-5-1:2025 – what changes.
For groups
The problem of a group is not the individual plant – it is comparability. Three plants, three ways of measuring, three levels of detail in the records, and no answer to the simple question of where the group actually stands.
Sites and areas are kept in the organisation module, and the dashboard shows the compliance status per site as well as across all of them. The test plan is defined once and applies everywhere; a plant that falls behind becomes visible before the customer notices. Access follows the roles you already have – an area manager works with their own area, the ESD responsible person sees the whole programme.
From instrument to report
The reason this tool comes from people who measure themselves is visible in the path a single reading takes:
The reading is taken in the EPA with a calibrated instrument – a Safe-STAT for resistances, a field meter for electrostatic fields, a walking tester for the personnel-grounding system.
It is entered against the measuring point it belongs to, and assessed against that point’s limit straight away. Out of range is visible on the spot, not weeks later.
The device that took the reading is recorded with it. If its calibration has lapsed, that shows on the reading rather than in a footnote nobody reads.
The report is assembled from the readings themselves – per area, per period, per audit. No retyping, and nothing that only exists in one person’s files.
The instruments we use in our own measurement service are the ones we sell: to the measuring equipment.
Introduction
The setup is not the software – it is your structure. Sites, EPA areas, measuring points, instruments and the test plan have to exist before the first measurement can be recorded. Most of that already exists somewhere in your company: in a spreadsheet, in a folder, in the head of the person who has done it for years. Bringing it together is the actual work, and it is the part we do with you.
After that, the day-to-day is small: whoever measures enters readings, the responsible person looks at the dashboard and sees what is due. Master data changes when the production changes – a new area, a new instrument, a colleague who leaves. What used to be a spreadsheet nobody dared touch becomes a register anyone can keep.
Honest limits
A programme can be documented perfectly and still fail, because a wrist strap is not worn or a shelf is not grounded. Software makes the evidence complete; it does not make the EPA work. That is why the ESD-Manager is one part of what we do, not the whole of it.
What connects to it:
The independent walk-through with spot-check measurements – the check the software cannot do.
Calibrated measurements with a report per measuring point; the readings go into the software.
Classroom courses for coordinators and responsible persons.
The online course for operators, in 20 languages – linked to the qualification record.
If you have no coordinator, we can take on the role.
The price depends on how many sites and users you need, and on which modules you actually switch on. You receive a quote after a short demo, in which we look at your structure - number of plants, EPA areas and workstations - rather than at a price list that fits nobody.
It runs in the browser at esdmanager.app. There is nothing to roll out on the workstations, no server to set up in your network and no client that has to be kept up to date. A tablet on the shop floor works the same way as a PC in the office.
No - it carries it out. The plan stays your document: it defines which areas exist, which limits apply and how often you verify. The software takes that plan and turns it into dated tasks, records every measurement against its limit and keeps the evidence together. The plan says what has to happen; the software shows that it happened.
Usually yes, and it is worth doing - a year of history makes trends visible from day one. How far it goes depends on the shape your data is in: a clean spreadsheet per measuring point is straightforward, scans of paper records are not. We look at what you actually have during onboarding and say honestly what is worth importing and what is better left in the archive.
Yes. Sites and areas are kept in the organisation module, and the dashboard shows the compliance status per site as well as across all of them. A group with plants in several countries keeps one ESD standard instead of one per plant, and the online course exists in 20 languages for exactly that case.
They do not need one. You export the evidence for the period and the areas the auditor asks about and hand that over. Nobody outside your company gets a login, and the auditor gets exactly the section they asked for instead of a tour of your whole system.
No, and it is not meant to. The software keeps your evidence complete and shows where something is due. Whether the measures actually work in the EPA is something only a walk-through with measurements shows. What does change is the effort: an audit spent looking for documents becomes an audit spent looking at the production.
Qualifications are kept with the person, so you can see who has been trained and when the refresher falls due. The ESDL online course connects to it - participants learn in their own language and the certificate lands where the audit expects it.
A demo on your plants, your EPA areas and your test plan says more than any feature list. Tell us how many sites are involved and we will set it up.